EFFECT OF COMPRESSOR CARGO SUCTION PRESSURE AND TANK PRESSURE ON THE LENGTH OF THE RELIQUEFACTION PROCESS ON LPG/C GRIYA BORNEO

Authors

  • Bambang Sumali Merchant Marine Higher Education
  • April Gunawan Merchant Marine Higher Education
  • Larsen Barasa Merchant Marine Higher Education
  • Rika Desy Anggraini Merchant Marine Higher Education

DOI:

https://doi.org/10.31933/dijemss.v2i5.920

Keywords:

Compressor cargo suction pressure, tank pressure, and the duration of the reliquefaction process

Abstract

LPG / C Griya Borneo is a gas vessel with a semi-pressurized type, where the supporting components in the form of cargo handling equipment have a very big influence on the success and safety of ship operations. This is important to note because when the ship will carry out the loading process, the load temperature must be in accordance with the boiling point. High temperatures on ammonia loads can increase the pressure in the tank so that it exceeds the specified pressure limits and ammonia loads that have high temperatures need to be reliquefaction. In addition, the compressor compressor suction pressure that does not work in accordance with what is expected to affect the reliability process. This resulted in the reliquefaction process being longer than usual. The long reliquefaction process results in more fuel being used so that it costs a lot. Therefore the writer makes a thesis related to the problems experienced by the ship owned by PT Humpuss Transportasi Kimia aims to find out how much influence the compressor compressor suction pressure and tank pressure on the process of reliquefaction on the LPG / C Griya Borneo ship, the place where the authors practice.

References

Arikunto, Suharsimi. 2010. Prosedur Penelitian: Suatu Pendekatan Praktik. Jakarta: PT Rineka Cipta
E. Karyanto dan Emon Paringga. 2003. Teknik Mesin Pendingin. Jakarta: CV Restu Agung.
Faires, Virgil Moring. 2004. Thermodynamics, Third Edition. New York : The Macmillan Company.
Gulo. 2002. Metodologi Penelitian. Jakarta: Gramedia Widiasarana Indonesia.
International Chamber of Shipping. 2000. Tanker Safety Guide Liquified Gas, Second Edition. London.
Lubis, Yasir Afai dan Bambang Daryanto Wonoyudo. 2014. ”Teknik Pomits Vol.3” Surabaya:Jurusan Perkapalan Institute Teknologi Bandung
Mayer, Jos L. 1990. Description and Function of Cargo Handling Plant Operation Manual I. Papenburg : LPG/C Griya Borneo
Mayer, Jos L. 1990. Description and Function of Cargo Handling Plant Operation Manual I. Papenburg : LPG/C Griya Borneo
McGuire and White. 2016. Liquefied Gas Handling Principles On Ships And In Terminals Fourth Edition. London : SIGTTO.
Mahmud. 2011. Metode Penelitian Pendidikan. Bandung: Pustaka Setia.
Moh Nazir. 2011. Metode Penelitian. Bogor: Ghalia Indonesia.
Seagull. 2011. Tanker Safety Familiarization Basic Training for Liquefied Gas Tanker Operation (STCW Table A-V/1-2-1). Seagull.
Sugiyono. 2011. Metode Penelitian Kuantitatif, Kualitaif, dan R&D. Bandung: CV Alfabeta
Susilowati, Sri Endah. 2015. “Konversi Energi dan Manufaktur Edisi Terbit I”. Jakarta. Universitas Negeri Jakarta.
Woolcott. 2000. Liquified Petroleum Gas Tanker Practice. Glasgow : Brown, Son, and Ferguso

Published

2021-07-31

How to Cite

Sumali, B. ., Gunawan, A. ., Barasa, L. ., & Desy Anggraini, R. . (2021). EFFECT OF COMPRESSOR CARGO SUCTION PRESSURE AND TANK PRESSURE ON THE LENGTH OF THE RELIQUEFACTION PROCESS ON LPG/C GRIYA BORNEO. Dinasti International Journal of Education Management And Social Science, 2(5), 791–818. https://doi.org/10.31933/dijemss.v2i5.920