Risk Analysis Of Construction Planning Affecting Quality, Time, and OHS Control on Management Performance in Warehouse and Logistics Industry

Authors

  • Muhammad Fauzi Universitas Trisakti, Indonesia
  • Darmawan Pontan Universitas Trisakti, Indonesia
  • Muhammad Zaki Universitas Trisakti, Indonesia
  • Tulus Widiarso Universitas Trisakti, Indonesia

DOI:

https://doi.org/10.38035/dijemss.v6i3.4036

Keywords:

logistics industry, risk, quality control, time control, occupational health and safety (OHS) control, management performance

Abstract

The logistics industry in Indonesia is growing in line with the increase in online transactions. Warehouse facilities play a crucial role in the logistics industry as they are essential for ensuring smooth business operations. Warehouses used for logistics purposes generally employ steel construction. The development of steel-structured warehouses carries considerable risks that can affect project completion time, project quality, occupational health and safety (OHS), and management performance. Therefore, management must be able to identify and analyze all potential risks during warehouse construction to ensure the project is completed with planned quality, OHS control, and timing. This study aims to identify the relationships among risk factors during the planning and construction phases with quality control, time, and OHS, which can influence management performance. Additionally, it seeks to measure the impact of project control, particularly in terms of quality, time, and OHS, on management performance in warehouse and logistics industry development. The research employs a quantitative descriptive method. Data analysis was conducted using Structural Equation Modeling (SEM) with the Smart PLS application. The study found that risks have a direct positive impact on quality control, time, and OHS but an insignificant negative impact on management performance. Furthermore, the findings indicate that quality control, time, and OHS significantly and positively influence management performance.

References

Andriani, Delfiarina., Anik Ratnaningsih dan Paksitra Purnama Putra. (2022). Analisis HIRARC Risiko K3 Fabrikasi dan Erection Gedung Baja Pembangunan Hotel Loji Kridanggo Boyolali. RekaRacana: Jurnal Teknik Sipil, Vol. 08, No. 02, Hal. 70-81.

Alkaissy, Maryam., Mehrdad Arashpour, Baabak Ashuri, Yu Bai, Reza Hosseini. (2020). Safety management in construction: 20 years of risk modeling. Safety Science 129 (2020) 104805, https://doi.org/10.1016/j.ssci.2020.104805.

Alomari, Kasim A., John A. Gambatese and Nicholas Tymvios. (2018). Risk Perception Comparison among Construction Safety Professionals: Delphi Perspective. J. Constr. Eng. Manage., 2018, 144(12): 04018107.

Arafat, Yaser dan Retna Hapsari Kartadipura. (2018). Analisis Faktor Implementasi Manajemen K3 Terhadap Kinerja Biaya Pelaksanaan Proyek Konstruksi. Jurnal Teknologi Berkelanjutan (Sustainable Technology Journal), Vol. 7 No. 1 (2018) pp. 16-25.

Asmarantaka, Nadya Safira. (2014). Analisis Risiko Yang Berpengaruh Terhadap Kinerja Proyek Pada Pembangunan Hotel Batiqa Palembang. Jurnal Teknik Sipil dan Lingkungan, Vol 2, No 3 (2014), hal. 483-491.

Aulia, Amanda dan Susilawati. (2024). Analisis Kepatuhan Pekerja Konstruksi Pada Penggunaan Alat Pelindung Diri (APD). Gudang Jurnal Multidisiplin Ilmu, E-ISSN: 2988-5760, Volume 2, Nomor 6, Juni 2024, Page 513-516.

Ayenti, Erika dan Susilawati. (2024). Studi Literatur: Identifikasi Dan Analisis Pengendalian Risiko Kecelakaan Pada Pekerja Proyek Konstruksi. Gudang Jurnal Multidisiplin Ilmu, E-ISSN: 2988-5760, Volume 2, Nomor 6, Juni 2024, Page 483-485.

Cleland, David I., and Lewis R. Ireland. (2007). Project Management: Strategic Design and Impementation 5th ed. New York: McGraw-Hill eBooks.

Defi, Reni Shintia dan Fahmi Firdaus Alrizal. (2022). Pengaruh Faktor Manajemen Risiko Terhadap Konstruksi Berkelanjutan Pada Pelaksanaan Proyek Di Perdesaan. Seminar Nasional Sains dan Teknologi Terapan X 2022. ISSN: 2685-6875. Institut Teknologi Adhi Tama Surabaya.

Djaelani, Muhammad dan Eli Retnowati. (2022). Pengaruh Pengawasan Kerja Dan Penerapan Program Keselamatan Dan Kesehatan Kerja Terhadap Produktivitas Pekerja Proyek Konstruksi. Jurnal Satyagraha, Vol.05, No.02, hal. 32-38, Agustus 2022 - Pebruari 2023. ISSN: 2620-6358.

Ghozali, I & Latan, H. (2015). Partial Least Square Konsep Teknik dan Aplikasi Menggunakan Program SmartPLS 3.0 (2nd Edition). Semarang: Penerbit Universitas Diponegoro.

Hoonakker, P.C., Pascale, Loushine, Todd (2010). Barriers and bene?ts of quality management in the construction industry: an empirical study. Total Quality Manage., 21, 953–969.

Irawan, Dede., Wahidin, Abdul Latif Nurdin, Abdul Khamid & Yulia Feriska. (2020). Model Analisis Pelaksanaan Proyek dengan Metode Critical Path Method (CPM) dan Metode Crashing (Study Kasus pada Pelaksanaan Pekerjaan Peningkatan Jalan Kebandingan – Gembongdadi, Kecamatan Kramat, Kabupaten Tegal). Infratech Building Journal (IJB), vol.1, no.2, September 2020, hal. 96~102.

Iribaram, Fahmi Wati dan Miftahul Huda. 2018. Analisa Resiko Biaya dan Waktu Konstruksi pada Proyek Pembangunan Apartemen Biz Square Rungkut Surabaya. Axial, Jurnal Rekayasa dan Manajemen Konstruksi. Vol. 6, No. 3, hal. 141-154.

Juliana. (2016). Analisis Pengendalian Biaya dan Waktu pada Proyek Konstruksi dengan Metode Earned Value Management (EVM). Factor Exacta. Vol. 9, No. 3, hal. 257-265.

Komarujjaman, Ubah Aman., Abdul Latif Nurdin, Imron, Yulia Feriska, Wahudin Diantoro. (2023). Occupational Safety and Health (K3) Cost Planning in Building Construction Project (Case Study in Brebes Regency Integrated Government Office Building). Era Sains: Journal of Science, Engineering and Information Systems Research, Vol. 1, No. 1, Maret 2023, e-ISSN: xxxx-xxxx, p-ISSN: xxxx-xxxx, Hlm. 66-77.

Maditsaraga, Ganesh Adimas dan Darmawan Pontan. (2021). Evaluasi Faktor Dominan Yang Mempengaruhi Rantai Pasok Pada Proyek Konstruksi Gedung Politeknik Negeri Bengkalis. Prosiding Seminar Intelektual Muda #5, Inovasi Keberlanjutan Binaan Melalui Riset dan Karya Desain, 22 Februari 2021, hal: 98 - 104, ISBN 978-623-91358-3-3, FTSP, Universitas Trisakti.

Nurlela dan Heri Suprapto. (2014). Identifikasi Dan Analisis Manajemen Risiko Pada Proyek Pembangunan Infrastruktur Bangunan Gedung Bertingkat. Jurnal Desain Konstruksi Volume 13 No. 2, Desember 2014, hal. 114-124.

Pheng, L. S., & Pong, C. Y. (2003). Integrating ISO 9001 and OHSAS 18001 for Construction. Journal of Construction Engineering and Management, 129(3), 338–347. doi:10.1061/(asce)0733-9364(2003)129:3(338).

Prabawani, Riana Widya. (2012). Analisis Dampak Risiko Proyek Terhadap Kinerja Proyek (Studi pada Industri Konstruksi di Jawa Tengah Periode Tahun 2001-2010. Jurnal Bisnis Strategi, Vol 21 No 2 Desember 2012, hlm. 79-91.

Riyanto. (2014). Evaluasi Kinerja Proyek Dan Faktor Resiko Terhadap Pembiayaan Dan Profit Pada Proyek Perumahan (Studi Kasus Proyek Perumahan “Sukodono Dian Regency” Di Sukodono Sidoarjo Jawa Timur). Extrapolasi Jurnal Teknik Sipil Untag Surabaya, Vol. 7 No. 1, hal. 93 – 106, P-ISSN: 1693-8259 Juli 2014.

Sekaran, U., & Bougie, R. (2017). Reserach Methode for Business. West Sussex: John Wiley & Sons Ltd.

Serpella, Alfredo Federico., Ximena Ferrada, Rodolfo Howard, Larissa Rubio. (2014). Risk management in construction projects: a knowledge-based approach. Procedia - Social and Behavioral Sciences, 27th IPMA World Congress 119 (2014), 653 – 662.

Setiawan, Ade Tri, dan Muhammad Heri Zulfiar. (2019). Potensi Kecelakaan Kerja Pada Pembangunan Gudang Konstruksi Baja. Program Studi Teknik Sipil, Fakultas Teknik, Universitas Muhammadiyah Yogyakarta.

Sumantri, Angga., Nunungwidyaningsih, Bambang P. K. Bintoro. (2020). Risk analysis of construction planning that affecting quality and time control in the apartment development performance using PLS-SEM method (case study in apartments in Tangerang). International Journal of Engineering & Technology, 9 (2) (2020) 546-551.

Suroso, Hastawati Chrisna dan Kukuh Eska Yanuar. (2020). Analisa Potensi Bahaya Pada Perusahaan Fabrikasi Baja Menggunakan Metode HAZOP (Hazard and Operability Study). Journal of Advance Information and Industrial Technology (JAIIT), Vol. 2, No. 1, hal. 13-21.

Vu, Hong Anh., Viet Hung Cu, Lian Xing Min, Jian Qiong Wang, (2016). Risk analysis of schedule delays in international highway projects in Vietnam using a structural equation model. Engineering, Construction and Architectural Management, https:// doi.org/10.1108/ECAM-06-2016-0138.

Yana, Anak Agung Gde Agung., Anak Agung Diah Parami Dewi dan Kadek Yasasi Dwinanjaya. (2020). Faktor-Faktor Yang Mempengaruhi Kinerja Proyek Dalam Pelaksanaan Proyek Konstruksi Gedung (Studi Kasus: Proyek Pemerintah Kabupaten Badung). Jurnal Spektran, vol. 8(2).

Downloads

Published

2025-02-17

How to Cite

Fauzi, M., Pontan, D., Zaki, M., & Widiarso, T. (2025). Risk Analysis Of Construction Planning Affecting Quality, Time, and OHS Control on Management Performance in Warehouse and Logistics Industry . Dinasti International Journal of Education Management And Social Science, 6(3), 2275–2284. https://doi.org/10.38035/dijemss.v6i3.4036