COMPARATIVE ANALYSIS OF MAN POWER, PRODUCTIVITY, AND OUTPUT IN THE SHORT AND LONG CONVEYOR CONVEYOR USING MICRO MOTION (CASE STUDY: PT.EDS MANUFACTURING INDONESIA)

Main Article Content

Marisa Dosma Sitanggang

Abstract

The thesis is compiled to analyze the ratio of man power, productivity and output between short and long conveyor conveyor. In addition to analyzing the conveyor which is better to be applied in PT. EDS Manufacturing Indonesia by using micro motions. The analysis used by researchers working maps, motion studies and calculation of standard time obtained from the data retrieval researchers with methods of micro motion (use a stop watch).The sample in this study is that there are in the final process assy namely setting. From the results, it can be calculated that for man power has the addition of 58% from 7 to 12, to the output increase from be 51.17 units and poduktivitas takttime increased 9% from 4 units to 4.41 units and 20% productivity standard time of 3.35 units to 4.2 units.

Article Details

How to Cite
Dosma Sitanggang, M. (2020). COMPARATIVE ANALYSIS OF MAN POWER, PRODUCTIVITY, AND OUTPUT IN THE SHORT AND LONG CONVEYOR CONVEYOR USING MICRO MOTION (CASE STUDY: PT.EDS MANUFACTURING INDONESIA). Dinasti International Journal of Education Management And Social Science, 1(3), 306-318. https://doi.org/10.31933/dijemss.v1i3.148
Section
Articles

References

Azizan Mohamad (2017). Analysis of Time and Mootion Study using micromotion study in increasing the productivity of SMEs VARIOUS GLASS WORKS. Thesis. Industrial Engineering. Muhammadiyah Surakarta university. Surakarta
Hatani, La. (2008). Operational Management. Haluoleo University. Kendari.
Kusumawardhani RW. (2018). Analysis of Factors Affecting Time and Labor Productivity in Production Process Candied Carica CV Yuasa Food. Thesis. Management Bogor Agricultural University, Bogor.
Sutalaksana, Iftikar Z., et al. (2006). Mechanical System Design Works. ITB. Bandung.
Rahmawati, Noni Tri. (2017). Planning work measurement in determining the standard time by using time study in order to increase labor productivity in the oil pump division OT. Bukaka Engineering. Thesis. Economy. Pakuan University. Bogor.
Widyawati, Yunita. (2018). Motion studies, standard time, and the productivity of workers in the production process of a shock absorber. Thesis. Management Bogor Agricultural University. Bekasi.
Wijaya A, Andrijanto. (2014). System Repair Work To Improve Production Efficiency Time PT. Berdikari Metal Engineering in the Department of Press. https://www.google.com/search?hl=in&source=androidbrowsertype&qjurna l + wijaya + and + Andrijanto & gws_rd = ssl. (Accessed on June 1, 2019)
Yamit Z. (2002). Quality Management Products and Services. First Edition. Ekonisia. Yogyakarta