Electrical System, NYFGbY, NYY, MCCB, MCB

Abstract

The quality of electrical installations is highly dependent on the implementation and application of electrical installation standards, namely PUIL 2011 (General Requirements for Electrical Installations) and other supporting regulations. The implementation is to ensure the safety of humans, tools, and buildings, as well as the main requirement for electrical installations to be carried out safely, reliably, and environmentally friendly. So it is necessary to conduct an evaluation of the electrical system to ensure the safety, reliability, and efficiency of the system are in accordance with electrical installation standards. In the cadet dormitory building, there are several rooms that function as bedrooms, living rooms, pantries, warehouses, and toilets with an electrical system consisting of power outlets, lighting installations, and air conditioning. Based on the results of the study, the total installed load of LVMDP is 104,134 Watts using a 3-phase 250A MCCB with a cable size of 4x240 mm2 NYFGbY. The 1st floor AC panel has a total load of 27,360 Watts using a 3-phase 80A MCCB using a cable of 4x35 mm2 NYY. Lighting Panel & Socket on the 1st floor total load of 9,762 Watts using 3 phase 40A MCB using 4x16 mm2 NYY cable. AC Panel on the 2nd floor total load of 27,360 Watts using 3 phase 80A MCCB using 4x35 mm2 NYY cable. Lighting Panel & Socket on the 2nd floor total load of 5,473 Watts using 3 phase 20A MCB using 4x4 mm2 NYY cable. AC Panel on the 3rd floor total load of 27,360 Watts using 3 phase 80A MCCB using 4x35 mm2 NYY cable. Lighting Panel & Socket on the 3rd floor total load of 6,819 Watts using 3 phase 32A MCB using 4x6 mm2 NYY cable

References

Alfatih. 2013. Kelayakan Instalasi Listrik Rumah Tangga Dengan Pemakaiyan Lebih Dari 10 Tahun Kanagarian Nanggalo Kecamatan Koto XI Tarusan Kabupaten Pesisir Selatan. Teknik Elektro ITP. Vol.2, No.2.

Badan Standarisasi Nasional (BSN). 2000. Persyaratan Umum Instalasi Listrik 2000 (PUIL 2000). Jakarta: Yayasan PUIL.

Kantonno, E.R., Setiadji, J.S. & Hosea, E., No Date, ‘Evaluasi Perencanaan Sistem Kelistrikan Rumah Sakit “X” Berdasarkan Puil 2011 Dan Aplikasi Ecodial’, Jurnal Teknik Elektro, 16(2).

Muhammad Dodo. (2020). Evaluasi Kelayakan Instalasi Listrik Tegangan Rendah Di Atas Umur 15 Tahun Berdasarkan PUIL 2000 Di Desa Pujud Kecamatan Pujud Kabupaten Rokan Hilir. Tugas Akhir Skripsi. Riau: Fakultas Sains dan Teknologi Universitas Islam Negeri Sultan Syarif Kasim Riau.

Puil (Persyaratan Umum Instalasi Listrik) (2016) Amandemen 2011,Bsn.Jakarta.

Puil (Persyaratan Umum Instalasi Listrik) (2011),Bsn. Jakarta.

Rivai, M.B., 2022, ‘Perancangan Instalasi Penerangan Pada Gedung Bertingkat X’, Power Elektronik : Jurnal Orang Elektro, 11(2), 184.