[1]
Adi, D.P.K. and Fahriza, B. 2026. Analysis of the Impact of Spare Part Availability and Procurement Lead Time on Maintenance Operational Performance (Case Study: Batam Aero Teknik (BAT), Batam). Dinasti International Journal of Education Management and Social Science. 7, 5 (Jul. 2026), 4703–4713. DOI:https://doi.org/10.38035/dijemss.v7i5.6919.