Risk Management of Goods and Services Procurement at PT XYZ

Authors

  • Ridho Erfan Andika Graduate Management and Business Study Program, School of Business, IPB University, Kota Bogor
  • D. S Priyarsono Graduate Management and Business Study Program, School of Business, IPB University, Kota Bogor
  • Siti Jahroh Graduate Management and Business Study Program, School of Business, IPB University, Kota Bogor

DOI:

https://doi.org/10.38035/dijefa.v5i5.3573

Keywords:

Mitigation Action, House of Risk, Risk Events, Procurement

Abstract

PT. XYZ is a foreign investment company engaged in the manufacturing industry of building materials. The products produced by PT. XYZ are concrete wall bricks that adhere to Japanese Industrial Standards (JIS), and have also received SNI product testing certification. In its business processes, PT. XYZ requires supplies of goods and services. The procurement implementation at PT. XYZ applies a “procurement by user” model. Risks may occur in this process, such as a lack of transparency in the supplier selection process, procurement cost constraints, and insufficient professionalism in the receipt of goods or services. ISO 31000 can serve as a guideline for implementing risk management, and the method used in this research is the House of Risk (HOR). HOR Phase 1 will produce an output in the form of Aggregate Risk Potential (ARP), which determines the priority of risk agents that will undergo further action, along with an analysis using a Pareto diagram. Followed by HOR Phase 2, which will produce outputs in the form of the difficulty level of mitigation processes (Dk) and Total Effectiveness of Difficulty Level (ETDk), determining the effectiveness ratio of each mitigation action. In this research, 18 risk events and 17 risk agents were identified, with 2 priority risk agents that will receive mitigation actions. Through HOR Phase 2, five recommendations for mitigation actions were obtained, with the top-ranking recommendation being the establishment of Standard Operating Procedures (SOP) for the procurement process

References

Arisanto, Joko. 2008. Kajian peran teknologi informasi dalam perbaikan proses penyediaan barang pada kontraktor kontrak kerja sama (KKKS): studi kasus Vico Indonesia. FASILKOM UI: Tesis.

Chapman, C., Cooper, D. 1987. Risk Analysis for Large Project Model, Methode and Cases. West Sussex John Willey & Sons Ltd.

Darma, E. 2017. Analisis Manajemen Risiko Dan Pengendalian Intern Pada Pengadaan Jasa Konstruksi (Studi Kasus Pengadaan Jasa Konstruksi Pada SKPD Di Lingkungan Pemerintah Provinsi Sumatera Barat) Analysis of Risk Management and Internal Control on Procurement of Construction Services (Case Study of Procurement of Construction Services at SKPD within the Provincial Government of West Sumatra.

Heizer dan Render. 2014. Manajemen Operasi. Jakarta: Salemba Empat.

Hines, T. 2004. Supply Chain Strategies: Customer Driven and Customer Focused. Oxford: Elsevier Butterworth-Heinemann.

ISO 31000. Pedoman Manajemen Risiko.

Maisano D, Franceschini F, Antonelli D. 2020. dP-FMEA: An innovative Failure Mode and Effects Analysis for distributed manufacturing processes. Quality Engineering, 32(3): 267 – 285.

Maulana, M. R., Tinangon, J. J., Wokas, H. R. M. 2021. Pengendalian Internal Melalui Risk Assessment Pengadaan Barang dan Jasa Pada Dinas Perumahan Rakyat dan Kawasan Permukiman Kabupaten Tolitoli. Jurnal Riset Akuntansi dan Auditing “GOODWILL”. 12(2).

Monczka, R.M., Handfield, R.B., Giunipero, L.C. and Patterson, J.L. 2015. Purchasing & Supply Chain Management. Cengage Learning Emea, Boston.

Oktalia, R. D., Nafiah, S. I., & Kusuma, D. 2020. Analisa Dan Mitigasi Risiko Pada Proses Pengadaan Barang Menggunakan Metode House Of Risk. IENACO, 318 – 323.

Petersen, K.J., Handfield, R.B. and Ragatz, G.L. 2005. Pemasok Integration into New Product Development: Coordinating Product, Process and Supply Chain Design. Journal of Operations Management, 23, 371 – 388.

Downloads

Published

2024-12-12

How to Cite

Andika, R. E., Priyarsono, D. S., & Jahroh, S. . (2024). Risk Management of Goods and Services Procurement at PT XYZ. Dinasti International Journal of Economics, Finance &Amp; Accounting, 5(5), 5425–5439. https://doi.org/10.38035/dijefa.v5i5.3573