This study aimed to analyze the production department’s partial productivity measurement using the Objective Matrix (OMAX) method at PT. GMK. The OMAX method's key performance indicators (KPIs) affecting the productivity index must be defined and weighted for each criterion using the Analytical Hierarchy Process (AHP). The study was conducted in the production division of PT. GMK, which produces compound chocolate. The results showed that the productivity of was affected by the partial productivity of raw materials and labor and the electric power’s effectiveness. Other factors were the minimization of overtime working hours, labor costs, downtime, as well as defective and semi-finished products. Moreover, this study determined the standard performance in the second semester of 2021. It also conducted a causal analysis using a fishbone diagram to find the cause of employees’ low productivity. The analysis showed that the average productivity index increased between January and August 2022.

References

Adlan, D.M; A.Devitha, S.Wibowo dan H.Satriago. 2005. Penerapan Konsep Six Sigma untuk Meningkatkan Proses Peramalan Penjualan pada Perusahaan Distribusi (Studi Kasus PT Bogasari Flourmills Div. pasta) Tesis Universitas Bina Nusantara.

Atthaillah, T., Nugroho Y., dan Qadri, M., 2021. Efficiency analysis of vannamei shrimp supply chain performance in PT Sari Indonesia Group, Suak Pandan Village, West Aceh Regency, Aceh Province. International Conference on Environmental, Energy and Earth Science. IOP Conf. Series: Earth and Environmental Science 1041 (2022) 012005.

Balkan, Dursun. 2009. Enterprise Productivity Measurement in Services by OMAX (Objective Matrix) Method and An Application with Turkish Emergency Service. Productivity Expert, Department of Research and Productivity Measuring-Monitoring, National Productivity Centre of Turkey.

Fewidarto, P.D. 1996. Proses Hirarki Analitik (Analytical Hierarchy Process).

Nasution, H. Arman. 2006. Manajemen Industri. Yogyakarta: Penerbit CV. Andi Offset.

Oktoriadi, Dodi. 2013. Analisis Pengukuran Indek Produktivitas Departemen Welding Pada PT XYZ dengan Metode Objective Matrix (OMAX) Tesis Universitas Mercu Buana.

Saaty, T. L. (1993). The Analytical Hierarchy Process: Planning, Priority Setting, Resource Allocation. Pittsburgh: University of Pittsburgh Pers.

Wahyuni, N., dan Alya R. 2022. Productivity measurement using Objective Matrix: a case study in plate mill. International Conference on Advanced Mechanical and Industrial engineering. IOP Conf. Series: Materials Science and Engineering 909 (2020) 012073.

Yamit, Zulian, 2007. Manajemen Produksi dan Operasi. Yogyakarta. Penerbit Ekonisia. FE UII.

Downloads

Published

2023-05-16