Analyzing the Effects of Supply Chain Management and Skilled Workforce Competency on Project Schedule Delays and Their Implications for Occupational Accident Prevention: Evidence From PT Daidan Group
DOI:
https://doi.org/10.38035/dijdbm.v7i3.6743Keywords:
Supply Management, Expert Workforce Skills, Schedule Delays, Workplace Accident PreventionAbstract
Project schedule delays and the high risk of workplace accidents remain major issues in construction project management, particularly those related to ineffective supply management and insufficient expert workforce skills. This study aims to analyze the effect of supply management and expert workforce skills on workplace accident prevention, with schedule delays as a mediating variable at PT Daidan Group. The research design employs a quantitative descriptive approach using a survey method. The population consists of technical workers and experts, with a sample of 157 respondents selected using purposive sampling based on the Slovin formula. Data were collected through structured questionnaires using a Likert scale. The data analysis technique applied is Structural Equation Modeling–Partial Least Squares (SEM-PLS). The results indicate that supply management and expert workforce skills have a positive and significant effect on schedule delays and workplace accident prevention. Schedule delays are also found to have a significant effect on workplace accident prevention and act as a mediating variable between independent and dependent variables. Inventory management and job knowledge dimensions are identified as dominant factors in improving operational effectiveness and workplace safety. These findings suggest that effective supply chain management and enhanced workforce competencies can significantly reduce delays and improve safety performance. The discussion highlights the importance of integrating supply management, human resource development, and project time control in creating a safe and efficient work environment. Therefore, companies are recommended to strengthen inventory control systems, enhance workforce training programs, and optimize project time management to support operational performance and sustainable safety culture
References
Arikunto, S. (2012). Prosedur penelitian: Suatu pendekatan praktik (Rev. ed.). Jakarta: Rineka Cipta.
Barasa, L., Malau, A. G., Hidayat, A., & Purnamasita, L. (2018). Pengaruh penggunaan peralatan bongkar muat terhadap produktifitas bongkar muat di PT. Pelindo II Cabang Pontianak. METEOR STIP Marunda, 11(2).
Creswell, J. W. (2014). Research design: Qualitative, quantitative, and mixed methods approaches (4th ed.). Thousand Oaks, CA: Sage Publications.
Czajkowska, A. (2025). Supply chain risk management in construction. Retrieved from https://www.astrj.com/pdf-204013-126522?filename=126522.pdf
European Agency for Safety and Health at Work. (n.d.). Supply chains’ role in promoting safety and health in construction and agriculture. Retrieved from https://osha.europa.eu/sites/default/files/documents/Supply-chains-role-promoting-safety-and-health-in-construction-and-agriculture-LIFT-OSH_EN.pdf
Firdaus, D. (2023). The influence of construction safety and government policies on worker productivity. Palembang: Universitas Bina Darma Repository. https://repository.binadarma.ac.id/7784/4/jurnal.pdf
Ghozali, I. (2017). Model persamaan struktural: Konsep dan aplikasi dengan program AMOS dan PLS (7th ed.). Semarang: Badan Penerbit Universitas Diponegoro.
Ghozali, I. (2021). Aplikasi analisis multivariate dengan program IBM SPSS 26 (10th ed.). Semarang: Badan Penerbit Universitas Diponegoro.
Ghozali, I., & Latan, H. (2021). Partial least squares: Konsep, teknik dan aplikasi menggunakan SmartPLS (3rd ed.). Semarang: Badan Penerbit Universitas Diponegoro.
Gunasekera, D., Cain, G., & Smith, M. (2015). A whole of supply chain systems approach to addressing workplace safety risk management (Research Report No. 158-1215-R01). Melbourne: Institute for Supply Chain and Logistics, Victoria University.
Hair, J. F., Black, W. C., Babin, B. J., & Anderson, R. E. (2019). Multivariate data analysis (8th ed.). Boston, MA: Cengage Learning.
Hair, J. F., Hult, G. T. M., Ringle, C. M., & Sarstedt, M. (2020). A primer on partial least squares structural equation modeling (PLS-SEM) (2nd ed.). Thousand Oaks, CA: Sage Publications.
Hair, J. F., Hult, G. T. M., Ringle, C. M., & Sarstedt, M. (2021). A primer on partial least squares structural equation modeling (PLS-SEM) (3rd ed.). Thousand Oaks, CA: Sage Publications.
Hussain, S. (2020). Impact of skilled and unskilled labor on project performance during the construction phase. SAGE Open. https://doi.org/10.1177/2158244020914590
Malau, A. G. (2023). The Effect of Work-Life Balance on Higher Education Employee Performance: Moderation of Organizational Support and Job Satisfaction Level. Journal of Innovation in Educational and Cultural Research, 4(2), 254–263. https://doi.org/10.46843/jiecr.v4i2.681
Malau, A. G., Barasa, L., & Sumali, B. (2019). Effect of competence and ship crew discipline on performance PT. Myclin Express Offshore. International Review of Management and Marketing, 9(5), 39-46.
Malau, A. G., Barasa, L., & Utami, A. P. (2021). Pengaruh kompetensi dan kompensasi terhadap kepuasan kerja awak kapal PT Amas Iscindo Utama. International Review of Management and Marketing, 11(3), 56-63.
Malau, A. G., Togatorop, A. L., & Sabpatari, F. (2021). Pengaruh kompetensi dan motivasi karyawan terhadap kinerja pelayanan penerbitan sertifikat kapal di Kantor KSOP Khusus Batam. Management Science & Marketing, 14(2), 123-130.
Messah, Y. A. (n.d.). Kajian penyebab keterlambatan pelaksanaan proyek. Retrieved from https://media.neliti.com/media/publications/142410-ID-kajian-penyebab-keterlambatan-pelaksanaa.pdf
Rahayu, M., & Sawitri, D. K. (2025). The investigation of work safety: The role of training and work experience at a flexible packaging company in Surabaya. Journal of Engineering Research, 1532–1540.
Rashid, Y. (2020). Analysis of delay factors and their effects on construction projects. Management Science Letters, 10, 1199–1206. https://www.growingscience.com/msl/Vol10/msl_2019_356.pdf
Ridwan, & Kuncoro, E. A. (2016). Cara menggunakan dan memaknai path analysis (Analisis jalur). Bandung: Alfabeta.
Saleh, R. A., & Othman, N. (2022). Overview of the causes of accident in construction industry: A comparative perspective. International Journal of Academic Research in Economics and Management Sciences, 11(4), 1–12. http://hrmars.com/index.php/pages/detail/IJAREMS
Sari, D. (2024). Analisis risiko dan faktor keterlambatan proyek: Dampak terhadap keselamatan kerja (Master’s thesis). Yogyakarta: Universitas Islam Indonesia. https://dspace.uii.ac.id/bitstream/handle/123456789/54172/20522311.pdf
Sarstedt, M., Ringle, C. M., & Hair, J. F. (2021). Partial least squares structural equation modeling. In C. Homburg, M. Klarmann, & A. Vomberg (Eds.), Handbook of market research (pp. 587–632). Cham: Springer.
Sekaran, U., & Bougie, R. (2020). Research methods for business: A skill-building approach (8th ed.). Chichester, UK: Wiley.
Selasdini, V., Barasa, L., & Wartono. (2018). Pengaruh ketersediaan utilisasi alat bongkar muat pelabuhan terhadap kinerja produktifitas di Pelabuhan Batu Ampar Batam. METEOR STIP Marunda, 11(2).
Simanjuntak, M. B., Winarno, W., Purnama, C., Simanjuntak, M., Wibowo, T. A., Palapa, A., & Simanjuntak, P. D. (2025). Professional perspectives on smart port cities: Integration of urban agriculture and maritime energy networks for sustainable coastal development (Transformative maritime education paradigms). BIO Web of Conferences, 199, 03009. https://doi.org/10.1051/bioconf/202519903009
Simanjuntak, M., Herawati, S., & Pangestu Gusti, A. (2024). The analysis of interpersonal communication and basic safety training with organizational policy as an intervening variable. International Journal of Maritime Studies, 5(1), 45–53. https://ejurnal.pip-semarang.ac.id/jdb/article/view/574
Siregar, V. Selasdini., Haryati, S., & Rizq, M. D. (2021). Pengaruh kebijakan perusahaan mengenai penempatan pelaut berijazah kompetensi kelas III sebagai juru mudi dan juru minyak terhadap pengembangan karir pelaut di atas kapal milik PT Tanto Intim Line. Jurnal Ilmu Pelayaran, 3(1), 25-32.
Sugiyono. (2017). Metode penelitian kuantitatif, kualitatif, dan R&D. Bandung: Alfabeta.
Sugiyono. (2019). Metode penelitian kuantitatif, kualitatif, dan R&D (2nd ed.). Bandung: Alfabeta.
Suryani, & Hendryadi. (2015). Metode riset kuantitatif: Teori dan aplikasi pada penelitian bidang manajemen dan ekonomi Islam. Jakarta: Prenadamedia Group.
Umar, H. (2012). Metode penelitian untuk skripsi dan tesis bisnis (2nd ed.). Jakarta: Rajawali Pers.
Winahyu, A., & Paramarta, V. (2025). Evaluasi supply chain management pada pelayanan fasilitas keselamatan dan kesehatan kerja (K3). AKADEMIK: Jurnal Mahasiswa Ekonomi & Bisnis, 5(1), 147–157.
Zhang, J., Zhang, F., Liu, S., & Zhou, Q. (2024). Enhancing work safety behavior through supply chain safety management in small and medium-sized manufacturing suppliers. Scientific Reports, 14, 22667. https://doi.org/10.1038/s41598-024-73098-0
Downloads
Published
Issue
Section
License
Copyright (c) 2026 Timoer Indraprasta Hermet, Ayudhia Pangestu, Marihot Simanjuntak

This work is licensed under a Creative Commons Attribution 4.0 International License.
Authors who publish their manuscripts in this journal agree to the following conditions:
- The copyright on each article belongs to the author(s).
- The author acknowledges that the Dinasti International Journal of Digital Business Management (DIJDBM) has the right to be the first to publish with a Creative Commons Attribution 4.0 International license (Attribution 4.0 International (CC BY 4.0).
- Authors can submit articles separately, arrange for the non-exclusive distribution of manuscripts that have been published in this journal into other versions (e.g., sent to the author's institutional repository, publication into books, etc.), by acknowledging that the manuscript has been published for the first time in the Dinasti International Journal of Digital Business Management (DIJDBM).








































