Identifying Communication Flow in the Development of Apartment Project X to Enhance Time Performance

Authors

  • Satya Aditama Project Management/Civil Engineering, Faculty of Engineering, Universitas Indonesia
  • Leni Sagita Riantini Project Management/Civil Engineering, Faculty of Engineering, Universitas Indonesia

DOI:

https://doi.org/10.38035/dijdbm.v5i4.2665

Keywords:

Communication Flow, Apartment Projects, Time Performance

Abstract

This research aims to develop a risk-based communication flow in apartment projects with a focus on improving time performance. The methods employed include surveys and case studies, with data collected through the creation and distribution of questionnaires to experts, along with an analysis of results conducted by Company X. The findings indicate that the communication flow implemented at PT. X has proven to be valid and effective. However, several factors hinder the smooth communication flow, such as inadequate planning and scheduling of work, insufficient communication due to mismatched methods and technologies, inefficient information distribution systems, inadequate project budget planning, lack of resources, incomplete scheduling of time and resources, inappropriate listening and speaking skills, lack of empathy among parties, inadequate facilities and infrastructure, emotional conditions, and lack of mastery of communication techniques. Based on these findings, several actions are recommended to enhance communication flow, including improving planning and scheduling of work, using communication methods and technologies appropriate to field conditions, improving information distribution systems, ensuring project budget planning availability, increasing resources, creating comprehensive time and resource planning, enhancing listening and speaking skills, improving empathy among parties, upgrading facilities and infrastructure, controlling emotional conditions, and enhancing mastery of communication techniques. By implementing these recommendations, it is hoped that the communication flow in apartment projects can operate more effectively and efficiently, thereby improving overall project time performance.

References

Arikunto, Suharsimi. (2006). Prosedur Penelitian Suatu Pendekatan Praktik. Rineka Cipta.

Darmayudha, N., Nudja, K., & Armaeni, N. K. (2015). Analisa Program Percepatan Pada Proyek Konstruksi Dengan Metode Penambahan Jam Kerja (Studi Kasus Proyek Pembangunan Agranusa Signature Villa Nusa Dua Bali). PADURAKSA: Jurnal Teknik Sipil Universitas Warmadewa, 4(1), 35-47.

Hapsari, W. P., Huda, M., & Rini, T. S. (2019). Pengaruh Manajemen Komunikasi Terhadap Kinerja Proyek Konstruksi (Studi Kasus Di Kota Surabaya). Axial: Jurnal Rekayasa Dan Manajemen Konstruksi, 6(3), 207-214.

Harsian, H. S. (2021). Faktor Penghambat Komunikasi Efektif Di Proyek Konstruksi Pemerintah Dari Perspektif Penyedia Jasa. Abstract Of Undergraduate Research, Faculty Of Post Graduate, Bung Hatta University, 17(3).

Maddeppungeng, A., Asyiah, S., & Toha, M. (2022). Analisis Pengaruh Pengendalian Material Dan Alat Berat Terhadap Kinerja Waktu Proyek Konstruksi (Studi Kasus Proyek Pembangunan Jalan Tol Serang–Panimbang Tahap 1). Fondasi: Jurnal Teknik Sipil, 11(2), 230-241.

Moreno, R., Oktaviani, C. Z., & Husin, S. (2022). Analisis Korelasi Faktor Komunikasi Proyek Terhadap Pencapaian Kinerja Waktu Di Kota Banda Aceh. Jurnal Arsip Rekayasa Sipil Dan Perencanaan, 5(1).

Mufardis, B., Oktaviani, C. Z., & Buraida, B. (2021). PROPORSI BIAYA SUMBER DAYA MANUSIA, MATERIAL DAN ALAT PADA PROYEK KONSTRUKSI JALAN. Journal of The Civil Engineering Student, 3(2), 127-133.

Ratno, D. (2015). PENGARUH FAKTOR-FAKTOR DALAM KOMUNIKASI ANTARA KONTRAKTOR, KONSULTAN DAN PIHAK PEMILIK TERHADAP KEBERHASILAN SEBUAH PROYEK DI KOTA MALANG (Doctoral dissertation, ITN Malang).

Robbani, B. (2019). Identifikasi Faktor Yang Berpengaruh Terhadap Kinerja Waktu Pelaksanaan Proyek Pengadaan Transmisi 500kv Sumatera. Racic: Rab Construction Research, 4(2), 54-65.

Sari, E. A. (2018). ANALISIS PENJADWALAN ULANG PROYEK DENGAN METODE PERT (ANALYSIS of RESCHEDULING of CONTRUCTION PROJECT by USING PERT METHOD)(Studi Kasus: Proyek Pembangunan Rumah Sakit UII).

Surachma, W. (2000). Dasar dan Tekhnik Research. CV Tarsito.

Suryani. (2016). Metode Riset Kuantitatif. Kencana.

Tutuko, B., Pudjiharjo, H. S., Nugroho, B. J., & Santosa, T. B. (2022). Analisis Sistem Manajemen Pengendalian Mutu Dalam Meningkatkan Kinerja Waktu Proses Konstruksi Bangunan Gedung Tinggi Di Kota Surabaya. Journal Of Civil Engineering And Technology Sciences, 1(2), 56-68.

Wheelen, Thomas L. & Hunger, David J., 2011, Strategic Management and Business Policy: Toward Global Sustainability, Upper Saddle River, Prentice Hall, New Jersey

Wijoyo, H. (2021). Manajemen Proyek Sistem Informasi. Insan Cendekia Mandiri.

Yanto, D. (2019). Analisis Durasi Penjadwalan Ulang Proyek Pembangunan Perumahan Dengan Menggunakan Metode Lsm (Linear Scheduling Method) (Doctoral Dissertation, Universitas Islam Riau).

Published

2024-06-26